Data processing center of the mobile operator, Kyiv

Region: Ukraine, Kyiv

Object: Data processing center, Kyiv

Industry: Telecommunications

Maximum total electrical capacity: 3,300 kVA

Application: Engineering infrastructure

Equipment:

2 FG Wilson Р1500Р3 diesel generator sets;
UPS Galaxy 7000 uninterruptible power supplies, 6 pcs. 300 kVA each;
ARC PDU power distribution units;

Power distribution panels and Schneider Electric busbar.

Brief description of works:

Construction of the engineering infrastructure of the corporate Data Processing Center in Kyiv

The engineering infrastructure of the corporate Data Processing Center (DTC) in Kyiv is designed to ensure the operation of the company’s IT equipment, including data storage and processing systems, VAS equipment (monitoring of various network, computing equipment and applications), NSS (cellular network switching system communication of the GSM standard), BSS (coding of voice channels, assignment of radio channels to telephone terminals, paging function, quality control of data transmission, implementation of reception and transmission of signals in the air environment and other tasks related to the functioning of the network), cross and telecommunication equipment .

The operating mode of the data center equipment is 24x7x365 in automatic mode with the possibility of prompt response of the personnel on duty in emergency situations around the clock. The level of operational reliability of the data center – TIER III.
The time of autonomous operation of IT and telecommunications equipment in the data center from UPS and EPP is 15 minutes.
The autonomous operation time of the data center from the DES is 8 hours with the possibility of refueling without disconnection.

Works performed by MADEK:

1. Development of project documentation for power supply systems of the data center facility:

FGWilson diesel generator sets;
Power distribution along the 0.4 kV line;
Uninterruptible power sources, distribution of power to IT racks;
Lighting is energy-saving based on LEDs;
grounding;
Cable lines, including cable ducts, trays, busbars;
Supply of IT racks of technological equipment;
Preparation of construction tasks for related organizations.

2. Installation and commissioning works:

Supply and installation of two FGWilsonP1500P3 diesel generators;
Supply and installation of more than 100 cabinets of panel equipment;
Supply and installation of uninterruptible power sources;
Supply and installation of power distribution racks of IT equipment;
Supply and installation of cable channels, trays;
Supply and installation of lighting, grounding;
Supply and installation of cable (more than 50 km of cable products laid), bus ducts;
Connection, power supply to all adjacent subsystems;
Equipment testing under load;
Commissioning works with delivered systems;
Preparation and submission of executive documentation;
Delivery and installation of a video surveillance system;
Delivery and installation of the monitoring system.

All systems are designed and implemented in accordance with the requirements of global standards and the latest achievements of leading manufacturers of equipment for data centers.